Home/Answers/Maintenance
CHIMNEY COST LAB / Maintenance

After Maintenance Processing

After Maintenance, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-03About 3 minLocal test
Quick answer

After Maintenance, spot-check the output, then decide whether to delete/archive the original; keep a backup. Sweep/inspection/waterproofing/cap maintenance.

Why it matters

A backup lets you roll back if the output is wrong.

Sweep.

Step by step

  1. Check inspection/blockage/cracks/liner/leaks/use type.
  2. Separate sweep/repair/liner/crown/masonry/cap.
  3. Get 2-3 quotes; confirm scope/photos/warranty.
  4. Contract states scope/safety/payment/warranty.

Common mistakes

  • Sweep only, not liner/cracks inspection.
  • Not checking leaks/masonry/crown.
  • No photos/scope.
  • No warranty/payment terms.

Checklist

  • Inspection/blockage/cracks/liner/leaks.
  • Sweep/repair/liner/crown/masonry/cap.
  • Photos/scope/permits/safety.
  • Warranty/payment/contract.
  • Budget/maintenance/use type.

Who it is for

If this is your first Maintenance, narrow by Sweep. and Inspection. first, then look at specific models.

Key facts

  • Sweep.
  • Inspection.
  • Waterproof.

FAQ

What should I do after Maintenance?

After Maintenance, spot-check the output, then decide whether to delete/archive the original; keep a backup. Sweep/inspection/waterproofing/cap maintenance.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: NFPA